Chemical Processing Plant Addition

Project Type: 
Chemical Processing Plant
Project Description: 
Site plan, Civil Engineering, and Structural Engineering for a 4-story 8,628 SF expansion of an existing chemical manufacturing plant building for support of new tanks and process equipment.Project Challenges; Deep pile-supported foundations (85 ton capacity); Wind/Seismic analysis of combined building structure(s); Operational plant during construction.
Kansas City, MO
Chemical Processing Plant
Plant Addition

Recent Projects by

City Utilities of Springfield Electrostatic Precipitator Analysis
Blot Engineering, Inc. (BEI) performed structural analysis on an existing electrostatic precipitator for increased positive/negative pressure loading due to the addition of a new scrubber system with increased fan speeds.
Manufacturing Plant Expansion
Blot Engineering, Inc. (BEI) provided a full range of civil, structural, and consulting engineering services for a 7,200 SF chemical manufacturing plant expansion project. The project included a new 4-story freight elevator connecting the main plant to a new loading dock warehouse.